Projects

VA Medical Center, Washington, D.C.:
Replacement of 27 exhaust fans throughout the building and installation of a 110-section motor control center with disconnects, vfd drives and an automated fan monitoring system; designed and built cardio pulmonary rehab clinic HVAC system; replacement of more than 4,000 sprinkler heads with new 155-degree quick response sprinkler heads.

Andrews Air Force Base, Md.:
Complete upgrade of the electrical and HVAC systems in multiple buildings; designed and installed seven exhaust systems for mess hall; designed and installed lighting for football field; built a 2,800-square-foot masonry addition to the family housing management office; upgraded and installed signs; repaired west gym locker room; installed several sets of playground equipment at the play structures building.

Washington Headquarters Services, Alexandria, Va.:
Exterior Power Plant RRMC. Design Construction & management of major renovations & upgrades to the underground facility and site to support its mission. Provide US Government with the ability to operate the site well into the 21st century with upgraded utility infrastructure systems. Preserve any historical elements of the facility. Total Cost: $18,405,993.00.

Pentagon Renovation Office, Arlington, Va.:
Task 01-repair/replace standpipes wedges 5-3: Design/build post 9/11 renovation of the pentagon’s stairwell standpipe fire suppression system. Total Cost: $2,836,146.00.

United States Army Engineer District, Baltimore, Md.:
Delano Hall Mech & Fire Alarm. Total Cost: $2,620,490.26.

Defense Finance and Accounting Services, Columbus Oh.:
BCSL Phase 2. Convert legacy space into additional server space, BCSR-L and complete requirements for BSCR-B conversion, along with the installation of a Liebert down flow CRAC units. Total Cost: $2,275,312.00.

Pentagon Renovation Office, Arlington, Va.:
Task 02-Fort Dedrick misc. projects: design/build a 5,000 sf area. demolition and renovation of 5,000 sf building to include electrical, mechanical and all architectural finishes. Total Cost: $2,215,000.00.

Andrews Air Force Base, Md.:
Eliminate mold in dorms 1600,1624,1631,1657. Total Cost: $1,820,868.19.

Andrews Air Force Base, Md.:
Design/build hvac building. 1419: complete upgrade of electrical and HVAC system. Total Cost: $1,709,965.00.

Pentagon Renovation Office, Arlington, Va.:
Task 03-data center renovation: install new fire alarm smoke detector pre-action sprinkler system, extensive cabling tray system, new chilled water piping w/insulation other misc. construction. Total Cost: $1,650,000.00.

Defense Finance and Accounting Services, Columbus Oh.:
BCSR-B Renovation Project. Total Cost: $1,650,000.00.

Army Corps of Engineers, Baltimore Md.:
indefinite delivery task order contract: 5 year term contract. Total Cost: $1,565,125.00.

Andrews Air Force Base, Md.:
Visitor Control Center. Total Cost: $1,487,160.84.

Andrews Air Force Base, Md.:
Design/build customer service area, building 1414: interior renovations, complete upgrade of electrical and HVAC system. Total Cost: $1,304,715.00.

Pentagon Renovation Office, Arlington, Va.:
Parade Field Utility Replacement- Design/build the parade field utility. Total Cost: $1,248,539.43.

Andrews Contracting, Andrews Air Force Base, Md.:
Repair locker room west gym, building 1444: complete renovation of locker room. Total Cost: $1,154,503.00.

Additional client and project information available upon request.